Details
-
Feature
-
Not Assigned
-
None
-
Data Processing
-
-
-
2
-
2
-
40
-
Team_SIM
-
Sprint 5
-
-
-
-
14.2
-
Stories Completed, Integrated, Solution Intent Updated, BDD Testing Passes (no errors), Outcomes Reviewed, NFRS met, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
-
-
SPO-863 SPO-878
Description
SDP's LMC has now been at the heart of a number of incidents (incident #0, SKB-7, SKB-9, SKB-13, SKB-14). This is not entirely unexpected given that the general LMC paradigm is not particularly well-suited for what SDP is doing - however it means we need to be very diligent with ensuring that we don't impact the development of other sub-systems.
Attachments
Issue Links
- relates to
-
SP-1419 Contribution to end-to-end PSI (LOW) integration and testing
- Done
- split to
-
SP-1485 Resolve transaction limit problem in SDP processing controller
- Done
-
SP-1486 Implement ADR-16 and ADR-22 in SDP LMC
- Done
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
- mentioned on