Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-1279

Document Logistical considerations for testing

Details

    • Enabler
    • Not Assigned
    • PI8, PI9, PI11
    • None
    • None
    • Services
    • Hide

      A list of the hardware and software systems available at PSI Low
      A lightweight document stating the logistical considerations for testing SKAMPI:

      • How to get access to PSI Low in remote
      • How to deploy new software artefacts to PSI Low
      • What additional support might be required for testing
      Show
      A list of the hardware and software systems available at PSI Low A lightweight document stating the logistical considerations for testing SKAMPI: How to get access to PSI Low in remote How to deploy new software artefacts to PSI Low What additional support might be required for testing
    • 2
    • 0
    • 9.6
    • PI22 - UNCOVERED

    Description

      There is need to document what are the logistical issues with accessing and utilising the systems of PSI Low, in particular from a remote point of view. This Enabler tries to resolve this.

      Attachments

        Structure

          Activity

            People

              j.santander-vela Santander-Vela, Juande
              u.badenhorst Badenhorst, Ursula
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 2.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Structure Helper Panel