Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-1018

OET to adapt to any changes in the observation state machine(s) resulting from ADR-8

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide

      OET implementation updated to comply with the revised Observing Control state model described in ADR-8.

      Show
      OET implementation updated to comply with the revised Observing Control state model described in ADR-8 .
    • 1
    • 1
    • 16
    • Team_BUTTONS
    • Sprint 2
    • 7.3
    • PI22 - UNCOVERED

    • PI7 SYSTEM_DEMO_2 Team_BUTTONS
    • SPO-560

    Description

      As a result of the changed observation state machine described in the decision of ADR-8 there will be a number of changes to the states and transtions in the subarray devices obsState and state machines. The OET & scripts should adapt to these changes as necessary.

      Attachments

        Issue Links

          Structure

            Activity

              People

                a.bridger Bridger, Alan
                a.bridger Bridger, Alan
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 1.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete43.0
                  Total43.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel