Produce Gemini Backplane

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide
      • Enables precise synchronisation of the all 12 Gemini LRUs (although initially there will only be 3 Gemini installed for AA0.5)
      • Upgraded backplane also allows individual Gemini LRU's to be turned on/off remotely
      • Backplane will be one step towards being a production item (its no longer the initial prototype)
      • Enhanced liquid manifold structure to reduce bending of backplane
      Show
      Enables precise synchronisation of the all 12 Gemini LRUs (although initially there will only be 3 Gemini installed for AA0.5) Upgraded backplane also allows individual Gemini LRU's to be turned on/off remotely Backplane will be one step towards being a production item (its no longer the initial prototype) Enhanced liquid manifold structure to reduce bending of backplane
      • backplane testing shows 10MHz and 1pps skew to be less than 1ns 
      • backplane delivered to CSIRO for installation in the Low PSI
      • mechanically cards can be inserted with deflection less than 1mm 
    • 2.625
    • 2.625
    • 2.667
    • Team_PERENTIE
    • Sprint 5
    • 7.6
    • PI23 - UNCOVERED

    • CSP_Low.CBF PSI SYSTEM_DEMO_3 Team_PERENTIE
    • SPO-559

    Description

      Produce the upgraded Gemini Backplane and install in Perentie rack

      • In PI#6 the Gemini PCB was sent out for production
      • This feature monitors the production and testing of the updated Gemini backplane.
      • Some of the steps required are as follows:
        • Assemble components onto the Gemini backplane at ASTRON. 
        • Test the backplane functionality - 10MHz and 1pps distribution.
        • Prepare shipping case and ship to CSIRO.
        • Install backplane on second subrack.
        • Install liquid cooling manifold.
        • Install into Perentie rack and test.

      Attachments

        Issue Links

          Structure

            Activity

              People

                j.stoddart Stoddart, Jacque
                y.chen Chen, Yuqing
                Votes:
                0 Vote for this issue
                Watchers:
                8 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.625

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete34.0
                  Total34.0

                  Dates

                    Created:
                    Updated:
                    Resolved: