Install initial TPM into Low PSI and establish optical link

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
      • Avoid the big bang approach to integration 
      • Get to know the LFAA hardware, firmware and software - reduce surprises
      • Data of any sort can start flowing between LFAA and CSP
    • 1.6
    • 3
    • 21.875
    • Team_PERENTIE
    • Sprint 1
    • 6.2
    • PI22 - UNCOVERED

    Description

      • As part of the end-to-end signal chain goal Perentie is going to install the first TPM into the Low PSI facility at CSIRO. 
      • Perentie don't know exactly what we are going to receive as yet - so the bar is set low for integration goals (getting it and powering it may be a fallback goal).
      • We hope to establish an optical link between the TPM and the Gemini card. 

      Attachments

        Issue Links

          Structure

            Activity

              People

                d.hayden Hayden, Daniel
                y.chen Chen, Yuqing
                Votes:
                0 Vote for this issue
                Watchers:
                10 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 1.6

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete913.0
                  Total913.0