Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-805

Modelling for the physical cabling routing within CPF and SPFand into racks

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • None
    • None
    • Services
    • Hide

      The risk that there is a cable management problem at the CPF and SPF will be mitigated. 

      Show
      The risk that there is a cable management problem at the CPF and SPF will be mitigated. 
    • 6
    • 6
    • 3.833
    • Team_SKANET
    • PI22 - UNCOVERED

    Description

      Taken from TIMN-254 (linked):

      "There are a significant number of cables coming into both CPF and SPF and dropping down into racks and into cabinets.There is some concern that the number of cables planned to go into racks will not be physically possible.

      There needs to be a modelling task to ensure that the planned connectivity is physically possible."

      Attachments

        Issue Links

          Structure

            Activity

              People

                b.mort Mort, Ben
                d.hayden Hayden, Daniel
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 6.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:

                    Structure Helper Panel