Details
-
Enabler
-
None
-
Obs Mgt & Controls
-
-
-
1
-
2
-
16
-
Team_BUTTONS
-
Sprint 3
-
-
-
6.5
Description
Once the knowledge transfer described in SP-760 is complete, a (short) document needs to be produced describing what re-factoring of the code is required to bring it into the SKA system. The document will include descriptions of:
- Refactoring needed to modularise the code
- Bring the code up to the SKA definition of done (DoD)
- testing required to meet the DoD requirements of 75-90% test coverage
- documentation (internal and user guide)