Reallocate TANGO protocol conversion and server from INSA to TM

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • 2.3
    • PI24 - UNCOVERED

    Description

      This is a result of the INSA CDR which, I believe, agreed the INSA-Controls ICD should in terms of the BMS SCADA protocol level rather than at the Tango protocol. This transfers responsibility for the protocol conversion and server provision from INSA to the SAFe Controls development.

      The work is to create an ICD (which can be fairly simple and maybe modelled on the INAU ICD) and ultimately do the software development inside a SAFe team. However, this isn't a big architectural concern or program risk so there isn't any design work needs to be done on the software side during bridging.

      Attachments

        Issue Links

          Structure

            Activity

              People

                Unassigned Unassigned
                n.rees Rees, Nick
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 0.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0