Develop vision and roadmap

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Hide

      Better alignment is achieved by having a roadmap.

      Show
      Better alignment is achieved by having a roadmap.
    • Hide

      Needs to be informed by solution intent.

      Needs to tie in with AIV \ TDT roadmap.

      Needs to be able to inform features \ capabilities \ enablers needed for next 3 PIs at least.

      Architectural enablers need to precede capabilities \ features.

      Show
      Needs to be informed by solution intent. Needs to tie in with AIV \ TDT roadmap. Needs to be able to inform features \ capabilities \ enablers needed for next 3 PIs at least. Architectural enablers need to precede capabilities \ features.
    • Team_SPMT
    • Show
      See https://confluence.skatelescope.org/display/SE/Bridging+Vision+and+Roadmap
    • 4.6
    • PI24 - UNCOVERED

    Description

      “The teams are struggling to see the context of what they are doing because the flow from system level architecture through the roadmap to capabilities and features is not clear”

      See also Problem Solving Workshop output.

      Attachments

        Structure

          Activity

            People

              r.brederode Brederode, Ray
              r.brederode Brederode, Ray
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 0.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Structure Helper Panel