Details
-
Feature
-
Not Assigned
-
None
-
None
-
Obs Mgt & Controls
-
-
2
-
0
-
-
-
5.5
Description
Now that the Pipeline for the LMC base classes has been standardised, there is an amount of technical debt exposed in the base classes themselves. This needs to be addressed.
Attachments
Issue Links
- relates to
-
SP-87 Clear the existing technical debt in TMC prototype and Base Classes
- Done