Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-490

System Level Network Capacity Analysis

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Not Assigned
    • None
    • None
    • Obs Mgt & Controls
    • Hide

      This work will provide a specified end to end capacity requirement for the network and ensure that it is possible to proceed to procurement with the correct technical specification for hardware and software based on a system view of the network  requirments. It will also allow for some future proffing as we can ensure that the network is not working to the maximum capacity on dy 1.

      Show
      This work will provide a specified end to end capacity requirement for the network and ensure that it is possible to proceed to procurement with the correct technical specification for hardware and software based on a system view of the network  requirments. It will also allow for some future proffing as we can ensure that the network is not working to the maximum capacity on dy 1.
    • Hide

      That the capacity of the end to end system network is clearly specified modelled and specified and full techinical specifications can be provided for procurement.

      Show
      That the capacity of the end to end system network is clearly specified modelled and specified and full techinical specifications can be provided for procurement.
    • 1
    • 0
    • Team_SKANET
    • Sprint 1
    • PI22 - UNCOVERED

    • Team_SKANET

    Description

      Provide a full Network capacity analysis of the end to end network for each telescope to ensure that all designs are adequate for the system technical requirements and procurement technical specifications will be accurate.

      Attachments

        Structure

          Activity

            People

              n.rees Rees, Nick
              j.hammond Hammond, Jill
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 1.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0

                Dates

                  Created:
                  Updated:

                  Structure Helper Panel