OST Prototype

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Not Assigned
    • PI25
    • COM OSO SW
    • None
    • Obs Mgt & Controls
    • Intra Program
    • 4
    • 0
    • Team_NAKSHATRA
    • PI24 - UNCOVERED

    Description

      For this first instance of a scheduling tool, we're looking to enable a user (operator) to be able to chose SBI's and add them to the list of SBIs to execute next.

      This means creating a UI (similar to the PTT?) that links into the ODA and OET from which a user can:
      1) select an SBI to put into the observing queue

      2) click a button to execute the SBI at the top of the list**

      3) the ability to remove an SBI from the observing queue

      **does not have to be the 'top of the list' necessarily, but that's a good default

      These requirements imply the following:
      a) ability to query the ODA to find SBIs that are ready for execution
      b) a box with a list of SBIs queued for execution
      c) the ability to move SBIs in the box from (b) up or down the list

      Attachments

        Structure

          Activity

            People

              p.klaassen Klaassen, Pamela
              p.klaassen Klaassen, Pamela
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 4.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0