Spike to discuss resurrecting L-Infra for non-observational monitoring and control

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Spike
    • Not Assigned
    • PI24
    • None
    • None
    • LOW ART
    • Hide

      TBD but for PI24 it is a Spike to develop a future implementation plan to address this gap

      Show
      TBD but for PI24 it is a Spike to develop a future implementation plan to address this gap
    • Team_JOEY

    Description

      • Discussion of resurrection of a Local Infra element - who and what are part of the scope of this group as well as key interfaces.
      • Discussion of implementation of local infra monitoring and control, including shutdown and startup of local infrastructure elements - see https://confluence.skatelescope.org/display/TDT/LOW+Use+Cases
      • Discussion on aggregation of non-observational M&C for the benefit of, for example, a Telescope Operator so that they can proceed with pressing the big green button on an observation.

      Attachments

        Issue Links

          Structure

            Activity

              People

                louisa.quartermaine Quartermaine, Louisa
                louisa.quartermaine Quartermaine, Louisa
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 0.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0