  2. SP-4590

Control LOW CSP with TMC Interface

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • High
    • PI24
    • LOW CSP
    • None
    • LOW ART
    • Hide

      Topic proposes to add business value by implementing TMC command and control as entry point to select LOW CSP integration tests in support of  Vulcan integration/verification efforts.

      This effort will allow early detection of possible incompatibilities that can be addressed through SKBs, verification of SKBs, assisting TMC with debugging and possible workarounds, facilitate better collaboration by strengthening LOW CSP collaboration and understanding of TMC. Notebooks that can be aligned and shared with Vulcan.

      Show
      Topic proposes to add business value by implementing TMC command and control as entry point to select LOW CSP integration tests in support of  Vulcan integration/verification efforts. This effort will allow early detection of possible incompatibilities that can be addressed through SKBs, verification of SKBs, assisting TMC with debugging and possible workarounds, facilitate better collaboration by strengthening LOW CSP collaboration and understanding of TMC. Notebooks that can be aligned and shared with Vulcan.
      • Evaluate SKB's and remove workaround - SKB-463
      • Implement test to configure PST mode with TMC for evaluation of SKB-355. 
    • 2.5
    • 2.5
    • 0
    • Team_TOPIC
    • Sprint 3
    • Overdue
    • PI24 - UNCOVERED

    •  Low G4

    Description

      (Goal 4) Formalize TMC into LOW CSP to mitigate risks to L1 integration and verification for AA0.5

      Objective:

      To verify that LOW CSP can be controlled from TMC. This is only interfacing, no integration.

      Aim:

      • Evaluate SKB's and remove workaround - SKB-463
      • Implement test to configure PST mode with TMC for evaluation of SKB-355.

      Business Value:

      Topic proposes to add business value by implementing TMC command and control as entry point to select LOW CSP integration tests in support of  Vulcan integration/verification efforts.

      This effort will allow early detection of possible incompatibilities that can be addressed through SKBs, verification of SKBs, assisting TMC with debugging and possible workarounds, facilitate better collaboration by strengthening LOW CSP collaboration and understanding of TMC. Notebooks that can be aligned and shared with Vulcan.

       

      Attachments

        Issue Links

          Structure

            Activity

              People

                Hariharan.Krishnan Krishnan, Hariharan
                R.vanRooyen van Rooyen, Ruby
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 2.5

                  IssuesStory Points
                  To Do10.0
                  In Progress   10.0
                  Complete00.0
                  Total20.0

                  Dates

                    Created:
                    Updated: