TMC: Investigate and create migration plan for new test harness uptake

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide

      Benefit is that we have a plan to port/develop new tests that rely on a better test harness and ideas about possible limits of the TH when seen as platform.

      Show
      Benefit is that we have a plan to port/develop new tests that rely on a better test harness and ideas about possible limits of the TH when seen as platform.
    • Hide
      • decisions have been made as to what old or new tests are candidates to rely on the new test harness
      • an analysis has been done and reported as to what additions are needed to the test harness (what new facades, wrappers, actions, configs, inputs) to support those tests; 
        • the analysis should identify (not define) these additions and be detailed enough to estimate the needed effort
      • based on such an analysis we (Emanuele, Giorgio, Verity) will identify the structural limits and possible solutions for the TH seen as a platform
      Show
      decisions have been made as to what old or new tests are candidates to rely on the new test harness an analysis has been done and reported as to what additions are needed to the test harness (what new facades, wrappers, actions, configs, inputs) to support those tests;  the analysis should identify (not define) these additions and be detailed enough to estimate the needed effort based on such an analysis we (Emanuele, Giorgio, Verity) will identify the structural limits and possible solutions for the TH seen as a platform
    • 0.5
    • 0.5
    • 0
    • Team_HIMALAYA
    • Sprint 2
    • Hide

      A confluence page is created that consists of:

      • The test cases that can be/needs to be migrated to make use of updated test harness
      • The estimation of efforts required to migrate the test cases
      • Identification of the changes required in the test harness (especially for ska-low)

      Link to the confluence page: https://confluence.skatelescope.org/display/SWSI/HM-541%3A+New+Test+Harness+Migration+Plan

      Show
      A confluence page is created that consists of: The test cases that can be/needs to be migrated to make use of updated test harness The estimation of efforts required to migrate the test cases Identification of the changes required in the test harness (especially for ska-low) Link to the confluence page: https://confluence.skatelescope.org/display/SWSI/HM-541%3A+New+Test+Harness+Migration+Plan
    • testing

    Description

      Attachments

        Issue Links

          Structure

            Activity

              People

                g.brajnik Brajnik, Giorgio
                Adam.Avison Avison, Adam
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 0.5

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete15.0
                  Total15.0