Mid Remote Power Station (RPS) MVP/Prototype support

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Not Assigned
    • PI23
    • MID Networks
    • None
    • Services
    • Hide

      The 21 RPSs are being provided by Ops but are required for the outer 7 dishes on each spiral arm. The plan is that the ++ RPS will be installed and operated by an Independent Power Producer (IPP), so that SKAO only had the cost of electricity. The baseline plan recognised that the RFI of the RPS was a risk, so the first two RPSs (SKA008 and SKA009) would be prototypes that would first have to be tested before rolling out the rest. SKA008 was chosen so that a long Dish baseline could be tested as part of AA2.

      During the refinement work it was realised that meeting the SKAO RFI requirements would be very challenging for the IPP, and that they would add a significant risk premium that would manifest in increased electricity charges for the RPS, for their lifetime. It was thus decided in Sept 2022, that SKAO would take design responsibility for the RPS and prove RFI compliance before handing the design to the IPP to build and operate. The change meant that there would be only one RPS prototype (SKA008), which should be tested, especially with regard to RFI, before contracting the IPP who will then build the remaining 20 RPSs (incl. SKA009). This delays the roll-out of all the RPS stations, which is the subject of this ECP.

      Show
      The 21 RPSs are being provided by Ops but are required for the outer 7 dishes on each spiral arm. The plan is that the ++ RPS will be installed and operated by an Independent Power Producer (IPP), so that SKAO only had the cost of electricity. The baseline plan recognised that the RFI of the RPS was a risk, so the first two RPSs (SKA008 and SKA009) would be prototypes that would first have to be tested before rolling out the rest. SKA008 was chosen so that a long Dish baseline could be tested as part of AA2. During the refinement work it was realised that meeting the SKAO RFI requirements would be very challenging for the IPP, and that they would add a significant risk premium that would manifest in increased electricity charges for the RPS, for their lifetime. It was thus decided in Sept 2022, that SKAO would take design responsibility for the RPS and prove RFI compliance before handing the design to the IPP to build and operate. The change meant that there would be  only one  RPS prototype (SKA008), which should be tested, especially with regard to RFI, before contracting the IPP who will then build the remaining 20 RPSs (incl. SKA009). This delays the roll-out of all the RPS stations, which is the subject of this ECP.
    • Team_IT, Team_SKANET
    • PI23 - UNCOVERED

    Description

      Support required from Services ART (SKANET & ORBIT) to support the Mid Remote Power Station (RPS) MVP/Prototype.

       

      This came up after PI 23 Planning had completed. Initially the first work was required for ~August 2024, however, this needs to be confirmed.

       

      ECP-220148 - Mid Remote Power Station (RPS) 1st roll-out - Configuration Management - SKAO Community Confluence (skatelescope.org)

      • SKAO Jira (skatelescope.org)

      Attachments

        Structure

          Activity

            People

              Jeremy.Main Main, Jeremy
              N.Quinn Quinn, Neil
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 0.0

                IssuesStory Points
                To Do00.0
                In Progress   29.0
                Complete00.0
                Total29.0

                Dates

                  Created:
                  Updated:

                  Structure Helper Panel