Establishment of Baseline SRCNet Resource Policies

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • SRCnet
    • Hide

      All with the context of being sufficient for v0.1:

      • The contents of the MUST have policies has at least been been drafted and shared
      • The policy maker group have endorsed the list of MUST have policies for v0.1
      • The contents of the SHOULD have policies has (at least) been been drafted and shared
      Show
      All with the context of being sufficient for v0.1: The contents of the MUST have policies has at least been been drafted and shared The policy maker group have endorsed the list of MUST have policies for v0.1 The contents of the SHOULD have policies has (at least) been been drafted and shared
    • 0.5
    • 0.5
    • 0
    • Team_SRCPT
    • PI23 - UNCOVERED

    • SRCNet0.1 operations-and-infrastructure

    Description

      Split off from SP-4135, establish the pledging process with Resource Board.

      Attachments

        Structure

          Activity

            People

              r.bolton Bolton, Rosie
              R.Cooper Cooper, Rose
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 0.5

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0