Investigation for integrating 48 beams work

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • LOW ART
    • Hide

      48 beams will likely be needed for AA1 and planning for this integration needs to start now

      Show
      48 beams will likely be needed for AA1 and planning for this integration needs to start now
    • Hide

      Document describing briefly the status of the RRI work, and the needed changes in the tests and control software

      Show
      Document describing briefly the status of the RRI work, and the needed changes in the tests and control software
    • 0.5
    • 0.5
    • 0
    • Team_MCCS
    • Sprint 4
    • LOW-G4 Team_MCCS mccs_firmware

    Description

      This Spike is to investigate what will be needed to integrate work being done by Prabu's team at RRI to enable 48 beams. This is not needed for AA0.5 but very likely to be a must for AA1. Eventually this functionality will need to be re-integrated into the main branch. In this Spike, we could include a review of the status of the RRI work at a minimum, and understand at a high level what tests will need to be updated and/or added, as well as any software. This includes a look at what simulation tests and hardware tests are needed as well as control software changes.

      Attachments

        Structure

          Activity

            People

              v.mohile Mohile, Vivek
              v.mohile Mohile, Vivek
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Feature Progress

                Story Point Burn-up: (8.33%)

                Feature Estimate: 0.5

                IssuesStory Points
                To Do13.0
                In Progress   28.0
                Complete11.0
                Total412.0