Cabinet Banks - Implement power sequencing and investigate COTS control

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Services, LOW ART
    • Hide

      High-level Cabinet Bank device needed in AA1 to

      • orchestrate power sequencing for banks of 3 cabinets (i.e. 6-station cluster) on the 3 mains phases
      • monitor and control COTS equipment in the cabinets (PDUs, network switches etc.)
      Show
      High-level Cabinet Bank device needed in AA1 to orchestrate power sequencing for banks of 3 cabinets (i.e. 6-station cluster) on the 3 mains phases monitor and control COTS equipment in the cabinets (PDUs, network switches etc.)
    • 3
    • 3
    • 0
    • Team_MCCS, Team_WOMBAT
    • Sprint 4
    • Hide

      Team Wombat investigated resources to provide Tango devices for COTS equipment in the SPS cabinets, identifying the existing SNMP device. This has been re-homed by MCCS from the itf-devices repo to ska-ser-snmp. It is undergoing deployment by MCCS {WIP}.

      The architecture for cabinet control was further investigated. A CabinetBank device was created. Our plan from PI22 was to orchestrate power control from this device, but on further investigation we concluded there were problems with this approach, necessitating a new plan. Therefore we discarded the remaining implementation tickets and instead executed further planning, culminating in a workshop and presentation {WIP}

      Show
      Team Wombat investigated resources to provide Tango devices for COTS equipment in the SPS cabinets, identifying the existing SNMP device. This has been re-homed by MCCS from the itf-devices repo to ska-ser-snmp. It is undergoing deployment by MCCS {WIP} . The architecture for cabinet control was further investigated. A CabinetBank device was created. Our plan from PI22 was to orchestrate power control from this device, but on further investigation we concluded there were problems with this approach, necessitating a new plan. Therefore we discarded the remaining implementation tickets and instead executed further planning, culminating in a workshop and presentation {WIP} . 
    • 23.6
    • Outcomes Reviewed, Accepted by FO
    • PI24 - UNCOVERED

    • LOW-G4 Team_MCCS Team_WOMBAT mccs_software

    Description

      Change of focus - late PI23...

      It became apparent once the stub device was implemented that rather than orchestrating power control from the top level repo we should introduce further choreography elements into the Spshw devices which are requiring power, akin to the way that e.g. tiles request power from their subrack. This will produce a more homogenous solution and will be better in the long run. Therefore we are stepping back from further development of the CabinetBank device in this PI and will focus instead on designing the architecture.

      • Propose an architecture for the new power control elements.
      • Discuss the proposals in a workshop and decide how to proceed.
      • Give a "demonstration" which explains the plans to stakeholders.

      The original description:

      • Complete implementation of Cabinet Bank device to orchestrate power sequencing for banks of 3 cabinets.
      • Early in PI23: Generate a list of all the COTS devices in the SPS cabinets and determine what the control system requires of them. Search for existing Tango devices with help from the Wombat team if needed. 
      • Second half of PI23: Wombat team to start designing/developing any missing devices.
      • Investigate where the device servers fit in the MCCS architecture and plan the work needed to integrate them with MCCS.

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                Thomas.Franzen Franzen, Thomas
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 3.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete718.0
                  Total718.0