Mid AA2 networks AA2 physical/logical designs & BoMs/get lead times

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Should have
    • PI24
    • MID Networks
    • None
    • Services
    • Hide

      Lead times for some networks items, such as switches, have become very long. Therefore we need to build BoMs (Bills of Materials), which requires a bit of design of the network for AA2+.

      Show
      Lead times for some networks items, such as switches, have become very long. Therefore we need to build BoMs (Bills of Materials), which requires a bit of design of the network for AA2+.
    • Hide

      Draft high level design and BoM available.

      Show
      Draft high level design and BoM available.
    • 1
    • 1
    • 0
    • PI23 - UNCOVERED

    • Mid G3

    Attachments

      Issue Links

        Structure

          Activity

            People

              Jeremy.Main Main, Jeremy
              Jeremy.Main Main, Jeremy
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 1.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0

                Dates

                  Created:
                  Updated:

                  Structure Helper Panel