Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-4230

OSO: Proposal Handling Tool (MVP)

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide

      By implementing an MVP of the proposal preparation tool with essential but basic end-to-end functionality, we will enable users propose a continuum observation end-to-end and will provide a subset of the future capabilities of the proposal preparation process for the SKAO.

      This MVP will enable science operations assess and validate the functionality, navigations, user experience of the tool. 

      Show
      By implementing an MVP of the proposal preparation tool with essential but basic end-to-end functionality, we will enable users propose a continuum observation end-to-end and will provide a subset of the future capabilities of the proposal preparation process for the SKAO. This MVP will enable science operations assess and validate the functionality, navigations, user experience of the tool. 
    • Hide

       


       

      •      User Guide and Navigation:
        • The tool should guide users through the proposal creation process with basic prompts for each section.
        • User documentation with more details should be made available to users.
      • Enhanced / Added Functionality:
        • Targets can be edited.
        • Observations can be edited.
        • Email invite to a Co-Investigator to participate in the proposal.
        • Continuum observation sets can be added to the proposal for MID or LOW
          • an arbitrarily long list of targets in.
          • Any technically possible spectral tuning.
        • Retract and resubmit PDFs to the Science Case and Tech Justification sections of the proposal.
      • Integration with ODA:
        • PHT can write the proposal specific data to the ODA which can be inspected (via pgAdmin).
      • Validation:
        • PHT can validate all user inputs against the capabilities of the telescope as defined in the OSD on the observation page
      • Testing:
        • Components and user journey tests provided
        • A side by side comparison of what a Proposal outputs in to the proposal data model, along side an equivalent SBD for the same observing setup. To look for gaps and being the steps toward a conversion layer.
      Show
                User Guide and Navigation: The tool should guide users through the proposal creation process with basic prompts for each section. User documentation with more details should be made available to users. Enhanced / Added Functionality: Targets can be edited. Observations can be edited. Email invite to a Co-Investigator to participate in the proposal. Continuum observation sets can be added to the proposal for MID or LOW an arbitrarily long list of targets in. Any technically possible spectral tuning. Retract and resubmit PDFs to the Science Case and Tech Justification sections of the proposal. Integration with ODA: PHT can write the proposal specific data to the ODA which can be inspected (via pgAdmin). Validation: PHT can validate all user inputs against the capabilities of the telescope as defined in the OSD on the observation page Testing : Components and user journey tests provided A side by side comparison of what a Proposal outputs in to the proposal data model, along side an equivalent SBD for the same observing setup. To look for gaps and being the steps toward a conversion layer.
    • 5
    • 3
    • 0
    • Team_STARGAZER
    • Sprint 5
    • PI23 - UNCOVERED

    • AA2 Team_STARGAZER

    Description

      High-level Scope Overview:

      The PPT MVP should provide the end-to-end ability to propose a Continuum observation with either the MID or LOW SKA telescopes  that will demonstrate a subset of the future capabilities of the PPT. 

      As such the expanded functionality of the PPT MVP will enable a user to:

      • Validate a proposal semantically.
      • Access to inline guide and user guide document.
      • Edit targets and observations.
      • Send email invite to Co-investigators 
      • Add a continuum observation set to a proposal.

      Out of Scope:

        • Response of invited investigators
        • User login 

      Attachments

        Issue Links

          Structure

            Activity

              People

                Adam.Avison Avison, Adam
                Adam.Avison Avison, Adam
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (6.52%)

                  Feature Estimate: 5.0

                  IssuesStory Points
                  To Do1830.0
                  In Progress   813.0
                  Complete43.0
                  Total3046.0

                  Dates

                    Created:
                    Updated: