Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-4068

Implementation of monitoring of the computing infrastructure at site and SPC, and manual safety/failure process

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Must have
    • PI22
    • None
    • None
    • LOW ART
    • Hide

      As AIV users and for Joey support team, this enabler is critical to ensure our computing and networking infrastructure is safe and reliable.

      Show
      As AIV users and for Joey support team, this enabler is critical to ensure our computing and networking infrastructure is safe and reliable.
    • Hide
      • Analysis of the existing computing/networking platforms monitoring and alerting tools and choose one option for the short-term
      • Customise the choosen monitoring and alerting tool for the platforms at site and SPC
      • Document manual failures handling and troubleshooting procedures
      Show
      Analysis of the existing computing/networking platforms monitoring and alerting tools and choose one option for the short-term Customise the choosen monitoring and alerting tool for the platforms at site and SPC Document manual failures handling and troubleshooting procedures
    • Intra Program
    • 2
    • 2
    • 0
    • Team_JOEY
    • Sprint 5
    • Overdue
    • PI24 - UNCOVERED

    Description

      • Analysis of the existing computing/networking platforms monitoring and alerting tools and choose one option for the short-term
      • Customise the choosen monitoring and alerting tool for the platforms at site and SPC
      • Document manual failures handling and troubleshooting procedures

      This enabler will require help/support from #!, SKANET teams. This also needs input from Pawsey (for SPC-based hardware) and from SKA-Low Engineering team (for MRO-based hardware).

      Attachments

        Issue Links

          Structure

            Activity

              People

                jc.guzman Guzman, JC
                f.graser Graser, Ferdl
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (18.58%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   1523.0
                  Complete45.25
                  Total1928.25

                  Dates

                    Created:
                    Updated:

                    Structure Helper Panel