      SRCNet 0.1 will need a functioning AAI model for representation of the future architecture. The existing SKA-IAM should fulfil this role, and future developments and improvements should be identified in order to meet 0.1 use-cases.

      Show
      SRCNet 0.1 will need a functioning AAI model for representation of the future architecture. The existing SKA-IAM should fulfil this role, and future developments and improvements should be identified in order to meet 0.1 use-cases.
    • Hide

      AAI specific use-cases for 0.1 have been identified and documented.

      Areas of development for the AAI/IAM platform are documented for future work.

       

      Show
      AAI specific use-cases for 0.1 have been identified and documented. Areas of development for the AAI/IAM platform are documented for future work.  
    • Team_PURPLE
    • Sprint 5
    • Hide

      User stories and use cases can be found on confluence: https://confluence.skatelescope.org/display/SRCSC/SRCNet+AAI+Design+Principles+and+Purple+User+Stories
      and on the working MIRO board: https://miro.com/app/board/uXjVN2MbgQ8=/?share_link_id=736700690432

      These will feed into work for PI22

      Show
      User stories and use cases can be found on confluence: https://confluence.skatelescope.org/display/SRCSC/SRCNet+AAI+Design+Principles+and+Purple+User+Stories and on the working MIRO board: https://miro.com/app/board/uXjVN2MbgQ8=/?share_link_id=736700690432 These will feed into work for PI22
    • 22.5
    • Stories Completed, Satisfies Acceptance Criteria, Accepted by FO
    • PI24 - UNCOVERED

    • PI21-PB SRCNet0.1

    Description

      The SKA-IAM prototype service has been in use for testing for a while now, and will likely meet most requirements for use with SRCNet 0.1. However, work should be done to understand what changes are needed and where work is required to ensure smooth operations.

      This work should consider the overlap between general AAI uses-cases and 0.1 specific use-cases.

      Attachments

        Issue Links

          Structure

            Activity

              People

                r.bolton Bolton, Rosie
                T.Dack Dack, Tom
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (42.86%)

                  Feature Estimate: 0.0

                  IssuesStory Points
                  To Do22.0
                  In Progress   00.0
                  Complete21.5
                  Total43.5