  2. SP-3943

Implement first version of Engineering dashboard needed for monitoring the state and operation of AAVS3

Details

    • LOW ART
    • Hide
      • Spike to first investigate mock-up and share with stakeholders the Engineering dashboard(s) needed for monitoring the state and operation of AAVS3.
      • First implementation deployed for use with AAVS3 provided with suitable documentation so that it can be extended by operations and/or AIV staff.
      Show
      Spike to first investigate mock-up and share with stakeholders the Engineering dashboard(s) needed for monitoring the state and operation of AAVS3. First implementation deployed for use with AAVS3 provided with suitable documentation so that it can be extended by operations and/or AIV staff.
    • 1.5
    • 0
    • 20.6
    • PI22 - UNCOVERED

    • Team_MCCS

    Attachments

      Issue Links

        Structure

          Activity

            People

              Unassigned Unassigned
              Thomas.Franzen Franzen, Thomas
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 1.5

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0

                Dates

                  Created:
                  Updated:
                  Resolved: