Details
-
Enabler
-
Should have
-
None
-
LOW ART
-
-
-
1
-
1
-
0
-
Team_PERENTIE
-
Sprint 5
-
-
-
-
-
Team_PERENTIE
-
Low G3
Description
- Install the AA0.5 LOW CBF System in the SPC (Pawsey)
- Work with TOPIC to procure the cabling required
- Travel to Perth to do the installation as part of PI#22 planning
- Work with SPC to modify the rack verticals so that networking cables can come from front of the rack