Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-3850

AA0.5 LOW CBF System SPC Installation

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Should have
    • PI21
    • None
    • LOW ART
    • Hide
      • Meets the contractual obligations of LOW CBF to install hardware in the LOW SPC
      • Gain greater understanding of the Pawsey operating environment to better prepare for future AA's
      • Have a third installation of the LOW CBF equipment 
      Show
      Meets the contractual obligations of LOW CBF to install hardware in the LOW SPC Gain greater understanding of the Pawsey operating environment to better prepare for future AA's Have a third installation of the LOW CBF equipment 
    • Hide
      • Ensure that ALIM is up to date with the latest configuration data 
      • Hardware installation is completed in the Pawsey centre
      • Hardware is labelled to SKAO standards
      • The as-built scan file document is up to date with the AA0.5 SPC installation
      Show
      Ensure that ALIM is up to date with the latest configuration data  Hardware installation is completed in the Pawsey centre Hardware is labelled to SKAO standards The as-built scan file document is up to date with the AA0.5 SPC installation
    • 1
    • 1
    • 0
    • Team_PERENTIE
    • Sprint 5
    • Hide
      Show
      The ALIM update is proposed to SKAO to reflect the latest changes and installation at the SPC for AA0.5 Hardware installation for AA0.5 at SPC is completed as per the plan TOPIC is on track providing the labelling for SPC installation The As-built Scan file is up-to-date The feature demo presentation is written here: https://docs.google.com/presentation/d/1AyO5ER9mvPVmooGvB2ml-apKuTEdcfUV5i0tawqMNDc/edit#slide=id.g2b7abc7d3f6_1_0
    • PI22 - UNCOVERED

    • Team_PERENTIE
    • Low G3

    Description

      • Install the AA0.5 LOW CBF System in the SPC (Pawsey)
      • Work with TOPIC to procure the cabling required
      • Travel to Perth to do the installation as part of PI#22 planning 
      • Work with SPC to modify the rack verticals so that networking cables can come from front of the rack

      Attachments

        Structure

          Activity

            People

              jc.guzman Guzman, JC
              y.chen Chen, Yuqing
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Feature Progress

                Story Point Burn-up: (100.00%)

                Feature Estimate: 1.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete68.0
                Total68.0

                Dates

                  Created:
                  Updated:

                  Structure Helper Panel