LOW CBF PTC#11 Delay Tracking Accuracy

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide
      • Completes the testing for the LOW CBF AA0.5 FAT
      • Demonstrates that delay tracking works for both the correlator and CNIC-VD
      • Enables system goal #1 to be achieved
      • Removes long standing risk of delay polynomial control loop in both software and hardware not functioning
      • Demonstrates a closed loop - delays in CNIC-VD compensated for in Correlator
      • Enables further CBF-SDP imaging tests to be run with multiple source
      Show
      Completes the testing for the LOW CBF AA0.5 FAT Demonstrates that delay tracking works for both the correlator and CNIC-VD Enables system goal #1 to be achieved Removes long standing risk of delay polynomial control loop in both software and hardware not functioning Demonstrates a closed loop - delays in CNIC-VD compensated for in Correlator Enables further CBF-SDP imaging tests to be run with multiple source
      • PTC#11 - delay tracking accuracy passes without errors
      • Test documentation is written up and complete
      • Test cases checked into gitlab and executable from in CI pipeline
    • 3.25
    • 3.25
    • 0
    • Team_PERENTIE
    • Sprint 4
    • Hide

      The feature demo presenation is drafted here: https://docs.google.com/presentation/d/12riGfmeelIHQGpDj4uFw7nU0K8OgN2q5v1jBmRUk3tM/edit#slide=id.g112dcb28055_0_0

      The key part of the feature is now completed and will be presented at the OMC System Demo 20.4: https://confluence.skatelescope.org/display/SE/2023-11-02+OMC+ART+System+Demo+20.4

      Show
      The feature demo presenation is drafted here: https://docs.google.com/presentation/d/12riGfmeelIHQGpDj4uFw7nU0K8OgN2q5v1jBmRUk3tM/edit#slide=id.g112dcb28055_0_0 The key part of the feature is now completed and will be presented at the OMC System Demo 20.4: https://confluence.skatelescope.org/display/SE/2023-11-02+OMC+ART+System+Demo+20.4
    • 20.6
    • Demonstrated, Satisfies Acceptance Criteria

    Description

      • Assumed starting point is functional delay polynomials in CNIC and correlator (but untested)
      • Write up test documentation to describe how the CNIC-VD is configured, controlled by the LOW CBF delay polynomial simulator and processed by the correlator
      • Execute PTC#11 - delay tracking accuracy to check that the resulting visibility phases are within specifications
      • Fix any bugs in the correlator, CNIC, delay polynomial creator, and other software
      • Integrate PTC#11 into the gitlab CI pipeline (new integration repo has been created but we need to configure a pipeline using existing or new tests, and set up triggers so other repos run the integration pipeline on merge requests)
      • Fix the CNIC download rate (extremely slow writing to disk from within Tango/k8s)

      Attachments

        Issue Links

          Structure

            Activity

              People

                Hariharan.Krishnan Krishnan, Hariharan
                y.chen Chen, Yuqing
                Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 3.25

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete3751.0
                  Total3751.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel