    • Feature
    • Not Assigned
    • PI3
    • None
    • Hide

      Required for System CDR

      Show
      Required for System CDR
    • Hide

      Sections completed and accepted by Peter Dewdney

      Show
      Sections completed and accepted by Peter Dewdney
    • Team_SKANET
    • Sprint 3
    • 3.4
    • PI24 - UNCOVERED

    Description

      Complete the following sections of the DBD:

      • Section 3.1.11 “Common IT and Network Infrastructure” – DT-168
      • Section 3.1.11.1 “IT Security” – 1^st^ draft completed
      • Section 5.1.3.6 “Data Transport for MID” – DT-184 – in progress
      • Section 6.1.3.6 “Data Transport for LOW” – DT-205
      • DT-111 Block Diagram for Mid
      • DT-112 Block Diagram for Low

      Attachments

        Issue Links

          Structure

            Activity

              People

                s.lloyd Lloyd, Sam
                s.lloyd Lloyd, Sam
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 0.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete2691.0
                  Total2691.0