Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-3582

Understand internal network & JISC connectivity between UK sites

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Must have
    • PI19
    • None
    • National SRC
    • Team_TEAL
    • Overdue
    • PI24 - UNCOVERED

    • Teal-B UKSRC

    Description

      Outcome

      Data required for M6 deliverable(s) on recommendations for the creation of site DMZs and DTN tuning

      Input for the network connectivity roadmap for JISC

      Key Results

             KR-1 – network diagram showing the JISC access link(s)  and connectivity of the DTNs in the site DMZ for DURAM

             KR-2 – network diagram showing the JISC access link(s)  and connectivity of the DTNs in the site DMZ for GÉÁNT

             KR-3 – network diagram showing the JISC access link(s)  and connectivity of the DTNs in the site DMZ for JBO

             KR-4 – network diagram showing the JISC access link(s)  and connectivity of the DTNs in the site DMZ for RAL

      Attachments

        Structure

          Activity

            People

              I.Collier Collier, Ian
              C.Bradley Bradley, Cassie
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 0.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete10.0
                Total10.0

                Dates

                  Created:
                  Updated:

                  Structure Helper Panel