Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-3581

Measure disk-to-disk performance at Cambridge and Manchester.​

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Must have
    • PI19
    • None
    • National SRC
    • Team_TEAL
    • Overdue
    • PI23 - UNCOVERED

    • Teal-B UKSRC

    Description

      Outcome

      Measured performance for data transfers into and out of the sites

      Input to considerations defining the locations for placement of data from the telescopes in the UK

      Key Results

      KR-1 – maximum and variation of disk-to-disk transfer rates for single flows as function of file size

      KR-2 – scaling of transfer rates with multiple flows

      Attachments

        Structure

          Activity

            People

              r.hughes-jones Richard Hughes-Jones
              C.Bradley Bradley, Cassie
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 0.0

                IssuesStory Points
                To Do10.0
                In Progress   10.0
                Complete20.0
                Total40.0

                Dates

                  Created:
                  Updated:

                  Structure Helper Panel