Details
-
Enabler
-
Must have
-
None
-
Services
-
-
- Identified networks related drawings are reviewed and feedback/approval provided
- Low PM accepts review output
-
0.5
-
0.5
-
0
-
-
-
-
19.6
-
Stories Completed, Satisfies Acceptance Criteria
-
-
SPO-2508
Description
During PI19 a contractor is expected to provide a number of drawings to SKAO which need review within a 5 day time period (delivery date is currently unknown).
An number of these (number unknown) are expected to required networks review.