Maintain TMC integration and deployment at MID ITF

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
      • The TMC software is deployed allowing real world testing.
      • TMC teams become aware early of any issues and can address them.
      • Feedback from AIV engineers is acquired and can inform future development.
    • Hide
      Show
      Stable TMC deployment at the MID ITF continues and can be used to control the CSP.LMC (and therefore an emulated MID CBF) and the SDP. Feedback from AIV is acquired and documented. The TMC is tested against <TBD> test set identified under PI19 Solution Goal 5.   https://confluence.skatelescope.org/pages/viewpage.action?pageId=218412619
    • 1
    • 0
    • 19.4
    • PI23 - UNCOVERED

    • TMC Team_HIMALAYA Team_SAHYADRI
    • SOL-G5

    Description

      This enabler covers the support required to maintain the deployment and use of the TMC at the MID ITF, such that the TMC can be used to control an emulated MID CBF (via the CSP.LMC-MID) and the SDP.

      This will allow an AIV engineer to begin the planned integration and verification activities at the ITF during PI19 and into PI20.

      Attachments

        Structure

          Activity

            People

              g.leroux Le Roux, Gerhard [X] (Inactive)
              Adam.Avison Avison, Adam
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 1.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0