Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-3353

RF SPS timestamped data into LOW CBF

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide
      • demonstrates a key part of the signal chain - the flow of time
      • demonstrates real RF digitised data flowing the system from end to end
      • demonstrates SPS data has valid timestamps being applied and used in the LOW CBF correlator 
      Show
      demonstrates a key part of the signal chain - the flow of time demonstrates real RF digitised data flowing the system from end to end demonstrates SPS data has valid timestamps being applied and used in the LOW CBF correlator 
    • Hide
      • LOW CBF processes real SPS data that starts at an arbitrary time
      • LOW CBF validates the SPS timestamps received (and in some manner can change the epoch to start at different values)
      • the SPS-CBF interface definitions relating to timestamps can be verified
      • the correlator can start processing at any arbitrary time, not just start processing on a canned sequence starting at a given time
      Show
      LOW CBF processes real SPS data that starts at an arbitrary time LOW CBF validates the SPS timestamps received (and in some manner can change the epoch to start at different values) the SPS-CBF interface definitions relating to timestamps can be verified the correlator can start processing at any arbitrary time, not just start processing on a canned sequence starting at a given time
    • 2
    • 2
    • 0
    • Team_PERENTIE
    • Sprint 3
    • Hide

      7-July-2023: Part 1 Demo given on the successful setup of RF, MCCS, CBF in the LOW PSI at https://confluence.skatelescope.org/display/SE/2023-07-06+OMC+ART+System+Demo+19.2 

      https://docs.google.com/presentation/d/1IG153zFN-gqliRoufqwQoiPVh9yJ15xU4StzlpX4kfE/edit#slide=id.g112dcb28055_0_0 

      30-August-2023: Part 2 Feature in progress - the firmware image is built and currently in testing with software.
      The Part2 feature demo is getting prepared here: https://docs.google.com/presentation/d/1MLLCoquHyXRo0t65eC-o2rMKOJ5j9E6Ewb4_SgsH9zM/edit#slide=id.g112dcb28055_0_0

      Show
      7-July-2023: Part 1 Demo given on the successful setup of RF, MCCS, CBF in the LOW PSI at https://confluence.skatelescope.org/display/SE/2023-07-06+OMC+ART+System+Demo+19.2   https://docs.google.com/presentation/d/1IG153zFN-gqliRoufqwQoiPVh9yJ15xU4StzlpX4kfE/edit#slide=id.g112dcb28055_0_0   30-August-2023: Part 2 Feature in progress - the firmware image is built and currently in testing with software. The Part2 feature demo is getting prepared here: https://docs.google.com/presentation/d/1MLLCoquHyXRo0t65eC-o2rMKOJ5j9E6Ewb4_SgsH9zM/edit#slide=id.g112dcb28055_0_0
    • 19.6
    • Stories Completed, Integrated, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI22 - UNCOVERED

    • Team_PERENTIE solution-goal-1
    • SOL-G1

    Description

      • Use the TPM data flowing into LOW CBF (either existing 1-station data, or 4 substation-data) to create an end-to-end signal chain
        • 1-station is existing functionality, if 4-station not available then use the CNIC virtual digitiser mode that can generate any number of substations
      • Use the timestamps in the SPS SPEAD packets in the calculation of the correlator visibility output packet timestamps
      • process the RF data in the correlator to show real data flowing through the signal processing stages
      • develop firmware and software to enable the correlator to start processing at any arbitrary time, not just start processing on a canned sequence starting at a given time

      Attachments

        Issue Links

          Structure

            Activity

              People

                j.stoddart Stoddart, Jacque
                y.chen Chen, Yuqing
                Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete1012.0
                  Total1012.0

                  Dates

                    Created:
                    Updated:
                    Resolved: