Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-3339

Product testing of the PST AA0.5 Complex Voltage Recorder in preparation for system integration testing in the LOW PSI

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Must have
    • PI19
    • COM PST SW
    • None
    • Data Processing
    • Hide

      Demonstrates the readiness of PST for system integration tests to AIV stakeholders:
      Provides quality assurance tests of the PST product and its interfaces, with simulators and engineering control interfaces, ahead of system integration tests with the actual hardware and telescope control.

      Show
      Demonstrates the readiness of PST for system integration tests to AIV stakeholders: Provides quality assurance tests of the PST product and its interfaces, with simulators and engineering control interfaces, ahead of system integration tests with the actual hardware and telescope control.
    • Hide
      • A Jupyter notebook that executes a happy path test case demonstrates readiness for system integration.
      • The notebook and associated documentation is available to use in the Low PSI environment.
      • The manual test and automatic tests refactored to use common test infrastructure.
      • The notebook supports optional inclusion of simulators of CBF (for PST input) and SDP (for PST output).
      • The PST Release is published in Jira, with links to the artefacts in the repository.
      Show
      A Jupyter notebook that executes a happy path test case demonstrates readiness for system integration. The notebook and associated documentation is available to use in the Low PSI environment. The manual test and automatic tests refactored to use common test infrastructure. The notebook supports optional inclusion of simulators of CBF (for PST input) and SDP (for PST output). The PST Release is published in Jira, with links to the artefacts in the repository.
    • 1
    • 1
    • Team_PST
    • Sprint 3
    • Hide
      • Jupyter notebook developed to execute a happy path test case, with optional support for enabling/disabling CBF simulator.
      • The notebook and associated documentation is available to use.
      • A notebook-test k8s target developed that can execute notebooks as part of CI pipeline (bonus outcome).
      • Manual test and automatic tests refactored to use common test infrastructure.
      • The Notebook is available in ska-pst (version 0.5.5), and will be included in the major PST release at the end of the PI. 
      Show
      Jupyter notebook developed to execute a happy path test case, with optional support for enabling/disabling CBF simulator. The notebook and associated documentation is available to use. A notebook-test k8s target developed that can execute notebooks as part of CI pipeline (bonus outcome). Manual test and automatic tests refactored to use common test infrastructure. The Notebook is available in ska-pst (version 0.5.5) , and will be included in the major PST release at the end of the PI. 
    • 19.4
    • Stories Completed, BDD Testing Passes (no errors), Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI22 - UNCOVERED

    • PST-G1

    Description

      A suite of BDD tests have been developed in PI18 that implement happy and unhappy path BDD tests, integrated with Xray. This Feature will:

      • address some technical debt in the test infrastructure used to execute the BDD tests
      • develop a Juypter notebook to demonstrate execution of happy-path test in Low PSI environment.
      • improve the user documentation of the manual test capabilities to enable execution by AIV or other stakeholders

      Attachments

        Issue Links

          Structure

            Activity

              People

                A.Noutsos Noutsos, Aristeidis
                a.jameson Andrew Jameson
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 1.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete712.0
                  Total712.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel