Deploy ska-low-cbf to CLP

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide

      Allows to initiate the testing of CBF components in CLP

      Show
      Allows to initiate the testing of CBF components in CLP
    • Hide

      Components deployed and basic communication / testing passes Ok

      Show
      Components deployed and basic communication / testing passes Ok
    • 3
    • 3
    • 0
    • Team_TOPIC
    • Sprint 5
    • Hide

      The Schroff rack was delivered late and we were not able to include the P4 switch. However we were still able to demonstrate deployment of CBF components and basic communication as part of https://confluence.skatelescope.org/display/SE/2023-05-25+OMC+ART+System+Demo+18.6.

      Show
      The Schroff rack was delivered late and we were not able to include the P4 switch. However we were still able to demonstrate deployment of CBF components and basic communication as part of https://confluence.skatelescope.org/display/SE/2023-05-25+OMC+ART+System+Demo+18.6 .
    • 18.6
    • Stories Completed, Integrated, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI24 - UNCOVERED

    • Solution-goal-1 Team_TOPIC
    • SOL-G1

    Description

      Fully deploy the CBF Tango devices to the CLP with the required hardware integrated:

      • ska-low-cbf-conn communicating with the P4 switch
      • ska-low-cbf-proc communicating with the Alveo cards

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                D.VanDerSchuur Van Der Schuur, Daniel
                Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 3.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete2118.0
                  Total2118.0