Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-3320

Rucio capacity and capability enchancements in B-L team

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Could have
    • PI18
    • None
    • Stories Completed
    • PI23 - UNCOVERED

    • PI18-PB SRC-DM

    Description

      Increase capacity of Rucio storage node at ChinaSRC, ingest visualisation data and replicate that data to at least one other SRC node (JPSRC/STFC).

      BH : Make Rucio works for several SRCs and huge datasets

      AC1:  Prepare storage(through Fibre link, NOT nfs) for SDC3-like dataset and Visualization dataset support (>20TB)
      AC2: if AC1 works well, increasing the storage to >100TB
      AC3: Rucio data replication and test suite working for transfer between ChinaSRC and JPSRC/STFC(1 at least)

      Attachments

        Issue Links

          Structure

            Activity

              People

                R.Barnsley Barnsley, Rob
                r.bolton Bolton, Rosie
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 0.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel