Finalize the EDA deployment and configuration approach

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide

      The work on this enabler provides a solution approach to deploy and administer the EDA configuration which is agreed upon by all relevant parties. The outcome of this enabler will help deploy the EDA in various software environments in PI 18 so that archiver data can be made available as early as possible.

      Show
      The work on this enabler provides a solution approach to deploy and administer the EDA configuration which is agreed upon by all relevant parties. The outcome of this enabler will help deploy the EDA in various software environments in PI 18 so that archiver data can be made available as early as possible.
    • Hide

      An approach for deploying and configuring the EDA is agreed upon between all relevant parties/teams and documented in Confluence.

      Show
      An approach for deploying and configuring the EDA is agreed upon between all relevant parties/teams and documented in Confluence.
    • 2
    • 2
    • 0
    • Team_HIMALAYA
    • Sprint 1
    • Hide
      • Analyzed different environments like PSI, ITF, Operation Sandbox and STFC.
      Show
      Analyzed different environments like PSI, ITF, Operation Sandbox and STFC. Identified minimum requirements for EDA and timescaledb chart for dish lmc. Documented the same in  [ https://docs.google.com/document/d/1lejNyOITS8RZc-LyvfJgNKYRRuPqWm6nHYN9_HOzkbs/edit?usp=sharing ] . Also performed some tests with low resources to test how many attributes and events can be handled successfully in such circumstances. Updated confluence with deployment diagrams for different environment scenarios. [ https://confluence.skatelescope.org/display/SWSI/EDA+Deployment+View ]
    • 19.1
    • Stories Completed, Integrated, Solution Intent Updated, BDD Testing Passes (no errors), Outcomes Reviewed, NFRS met, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI22 - NOTRUN

    • Team_BANG Team_HIMALAYA Team_SYSTEM
    • OMC-G3 SOL-G4

    Description

      There are some concerns over the existing approach to deploying and configuring the EDA. The scope of this enabler is to work out a solution that enables fulfilling the requirements of the developer team as well as addresses the concerns of the System team. The solution should specify:

      1. Way to deploy EDA for
        1. Mid and Low
        2. Various ska environments: dev, operation sandbox, PSI, ITF
      2. Way to administer the EDA configuration so that attributes of various subsystem devices are archived
        1. At the time of deployment
        2. Additions/modifications/deletions once the system is deployed
      3. Any security concerns
      4. Follow the best practices in k8s

      It is possible that separate approaches for different environments but having a single approach is better.

      Attachments

        Issue Links

          Structure

            Activity

              People

                Thomas.Juerges Juerges, Thomas
                a.dange Aditya Dange
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete18.0
                  Total18.0