L1 requirement for time-criticality of real-time calibration

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Spike
    • Not Assigned
    • None
    • None
    • None
    • 2
    • 2.6

    Description

      From discussions with SDP.

      Scientific requirement of the pipeline is not well defined. Real time loop is visible on the system level. Someone needs to ask what the telescope needs to do to support the science case. Defined as requirement for realtime direction dependent calibration, but it could be trivial if only for central beam.

      The suggestion is that this constitutes a Spike for a team. Currently there is a risk there is a poorly defined L1 requirement (may not be possible to meet it and is it achieveable)

      Attachments

        Issue Links

          Structure

            Activity

              People

                r.laing Laing, Robert
                m.deegan Deegan, Miles
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0