Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-3049

Rucio Technical Debt: Destroy "old"/"production" Rucio instance

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • True
    • SRCnet
    • Hide

      Having two Rucio instances is unnecessary given we are still in the prototyping stages and creates added maintenance overhead.

      Show
      Having two Rucio instances is unnecessary given we are still in the prototyping stages and creates added maintenance overhead.
      • Data "in" the old Rucio instance deleted as appropriate, and running Rucio services stopped
      • Data on the VMs copied as appropriate, k8s cluster torn down, all resources released.
    • 0.5
    • 0.5
    • 0
    • Team_MAGENTA
    • Sprint 3
    • Hide

      Rucio old/prod instance has been taken down and storage managers notified that the space previously allocated to it can be recycled.

      Steps taken:

      • Verified no useful notes/config on the cluster head/worker nodes
      • Removed references (locations) from the proxy config
      • Deleted worker/head node VMs
      Show
      Rucio old/prod instance has been taken down and storage managers notified that the space previously allocated to it can be recycled. Steps taken: Verified no useful notes/config on the cluster head/worker nodes Removed references (locations) from the proxy config Deleted worker/head node VMs
    • 20.1
    • Stories Completed, Accepted by FO
    • PI23 - UNCOVERED

    • SRC-DM SRC-Rucio SRCPB

    Attachments

      Issue Links

        Structure

          Activity

            People

              r.bolton Bolton, Rosie
              r.joshi Joshi, Rohini
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Feature Progress

                Story Point Burn-up: (100.00%)

                Feature Estimate: 0.5

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete44.0
                Total44.0

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Structure Helper Panel