Further advance the CSP.LOW PSI

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide

      The PSI is a crucial part of the overall verification and quality assurance strategy for LOW CSP. This feature ensures the path to full availability of the infrastructure is processed fast.

      Show
      The PSI is a crucial part of the overall verification and quality assurance strategy for LOW CSP. This feature ensures the path to full availability of the infrastructure is processed fast.
    • 4
    • 4
    • 40
    • 10
    • Team_TOPIC
    • Sprint 5
    • Hide

      These goals have been achieved:

      • All critical HW has been ordered
      • k8s cluster; p4 switch installed
      • SKA TOPIC network has been set up

      The Alveo server just arrived but has not yet been installed.

      Hardware needed by the CBF/Perentie has been shipped from the Netherlands to CSIRO in Sydney/Marsfield:

      • 2 P4 switches
      • Alveo server

      The above has been documented/logged on Confluence pages and JIRA dashboards, as demonstrated in OMC demo 17.5.

      Show
      These goals have been achieved: All critical HW has been ordered k8s cluster; p4 switch installed SKA TOPIC network has been set up The Alveo server just arrived but has not yet been installed. Hardware needed by the CBF/Perentie has been shipped from the Netherlands to CSIRO in Sydney/Marsfield: 2 P4 switches Alveo server The above has been documented/logged on Confluence pages and JIRA dashboards, as demonstrated in OMC demo 17.5.
    • 17.6
    • Stories Completed, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI24 - UNCOVERED

    • SYSTEM_DEMO_5 Team_TOPIC goal_S1

    Description

      Goal: Further advances to the CSP LOW PSI in TOPIC Netherlands. Integrating some of the components is expected to begin based on availability.

      Continue with TOP-5 activity defining the equipment needs for CLP.

      Goals:

      • All critical HW has been ordered (ASAP - sprint 1)
      • have Alveo server; k8s cluster; p4 switch installed in the rack
      • SKA TOPIC network has been set up

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                v.mohile Mohile, Vivek
                Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 4.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete3429.5
                  Total3429.5