Define Test Procedures for CSP.LOW

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide

      The TOPIC team is going to be responsible for the verification for LOW CSP. Establishing adequate Test Procedures is an integral aspect to ensure quality assurance for LOW CSP. 

      Show
      The TOPIC team is going to be responsible for the verification for LOW CSP. Establishing adequate Test Procedures is an integral aspect to ensure quality assurance for LOW CSP. 
    • 2.5
    • 2.5
    • 0
    • Team_TOPIC
    • Sprint 5
    • Hide

      Mostly Done:

      • A first version of the Verification Plan has been written, as has been demonstrated in OMC demo 17.6. However more work is needed before this can be regarded as a first, internally reviewed version.

      This feature will be completed in sprint 18.1. The work to be completed in 18.1 has been defined in these new tickets:

      • Update the Verification Plan: TOP-232
      • Internal review of the Verification Plan: TOP-225

      PI#18 update:

      Show
      Mostly Done: A first version of the Verification Plan has been written, as has been demonstrated in OMC demo 17.6. However more work is needed before this can be regarded as a first, internally reviewed version. This feature will be completed in sprint 18.1. The work to be completed in 18.1 has been defined in these new tickets: Update the Verification Plan: TOP-232 Internal review of the Verification Plan: TOP-225 PI#18 update: https://jira.skatelescope.org/browse/TOP-232 is Done https://jira.skatelescope.org/browse/TOP-225 is Done In fact the Verification Plan has been externally reviewed by SKAO, see https://jira.skatelescope.org/browse/TOP-295?src=confmacro
    • 18.6
    • Stories Completed, Integrated, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI24 - UNCOVERED

    • SYSTEM_DEMO_6 Team_TOPIC goal_S1

    Description

      Goal: Define the verification process for CSP_Low together with AIV and other stakeholders.

      • Write the Verification Plan
        • Define the plan content
        • Define the approach in emulating TMC as well as SPS and SDP. See TOP-59.
        • Internal review of the verification plan
        • Release the verification plan for external review (to CSP_Low stakeholders)
      • Elaborate the verification process by initial automated test on selected (L2 or similar) requirement

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                v.mohile Mohile, Vivek
                Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.5

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete79.0
                  Total79.0

                  Dates

                    Created: