    • Obs Mgt & Controls
    • Hide
      • Connects the SPS TPM into the P4 switch 
      • Connects the output of Low.CBF into the PST and SDP system
      • Shows end to end connectivity of the SKA Low signal chain 
      • Shows broader control of the signal chain via Jupyter in the Low PSI
      Show
      Connects the SPS TPM into the P4 switch  Connects the output of Low.CBF into the PST and SDP system Shows end to end connectivity of the SKA Low signal chain  Shows broader control of the signal chain via Jupyter in the Low PSI
      • SPS/PST/SDP are connected to the P4 switch
      • Data is flowing on all three interfaces at real time data rates
      • Data is being processed in the Correlator and Beamformer
    • 2
    • 2
    • 0
    • Team_PERENTIE
    • Sprint 4
    • Hide

      The first part of this planned end-to-end testing (SPS-CBF) is completed for PI#17.

      However, due to the late receiving of valid TPM data the second part (CBF-PST) is postponed into PI#18. We have moved the relevant stories into PI#18 plan.

      The feature demo of the first part is written here:

      https://docs.google.com/presentation/d/1I0Pqh0i4DsDzH9olkiwWOFdP57J5fxhR06bWYX3sa_M/edit#slide=id.g112dcb28055_0_0 

      We consider that there are still significant progress have been made and there are considerable amount of effort from various teams that contributed into this feature. 

      Show
      The first part of this planned end-to-end testing (SPS-CBF) is completed for PI#17. However, due to the late receiving of valid TPM data the second part (CBF-PST) is postponed into PI#18. We have moved the relevant stories into PI#18 plan. The feature demo of the first part is written here: https://docs.google.com/presentation/d/1I0Pqh0i4DsDzH9olkiwWOFdP57J5fxhR06bWYX3sa_M/edit#slide=id.g112dcb28055_0_0   We consider that there are still significant progress have been made and there are considerable amount of effort from various teams that contributed into this feature. 
    • 17.6
    • Stories Completed, Integrated, BDD Testing Passes (no errors), Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI23 - UNCOVERED

    • LOW_SUT1 SYSTEM_DEMO_4 Team_PERENTIE

    Description

      Complete the SKA Low signal chain by connecting SPS to CBF inputs, and PST/SDP to CBF outputs, and test with a test tone

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                y.chen Chen, Yuqing
                Votes:
                0 Vote for this issue
                Watchers:
                7 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete69.0
                  Total69.0