Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-2970

LOW.CBF 400G P4 Upgrade

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
      • Upgrades the P4 switch from the 100G EOL switch to current technology 
      • Enables higher bandwidth between switch (not needed until AA*) 
      • Enables higher bandwidth connections to external equipment 
      • 400G switch is installed in the Low PSI and connected to Alveo 
      • P4 code is recompiled in new environment and functional in system
      • P4 code is retested in test environment 
    • 2
    • 2
    • 0
    • Team_PERENTIE
    • Sprint 5
    • Show
      The feature is now completed.  The demo presentation is written here: https://docs.google.com/presentation/d/1c0ycL9hgAcjGKasj89J3RN-f_H9TInrgXRPgIiiK7wM/edit#slide=id.g112dcb28055_0_0  
    • 17.6
    • Stories Completed, Integrated, Outcomes Reviewed, Accepted by FO
    • PI24 - UNCOVERED

    • SYSTEM_DEMO_5 Team_PERENTIE

    Description

      Install the new 400G switch in the Low PSI and upgrade P4 switch environment and retest

      Attachments

        Issue Links

          Structure

            Activity

              People

                b.alachkar Alachkar, Bassem
                y.chen Chen, Yuqing
                Votes:
                0 Vote for this issue
                Watchers:
                6 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete1113.0
                  Total1113.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel