Agree on the packaging and delivery methods for the PSS software and start an early implementation

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Spike
    • Could have
    • PI17
    • COM PSS SW
    • None
    • Data Processing
    • Hide

      Specifies the PSS software delivery methods for deploying the software at testing facilities, which de-risks the development of the continuous deployment pipeline by removing uncertainties related to the required artefacts by integrators.

      Show
      Specifies the PSS software delivery methods for deploying the software at testing facilities, which de-risks the development of the continuous deployment pipeline by removing uncertainties related to the required artefacts by integrators.
    • Hide

      Given: A set of PSS products that will be tested at CSP LOW PSI

      When: The design of the PSS CI/CD pipeline is specified
      And: Information on the delivery method to CSP LOW PSI is requested by integrators

      Then: A specification for the products expected from the PSS continuous deployment and how these products will be packaged and pulled from the central artefact repository by the integrators has been agreed with System Engineering, System Team and integrator teams exists

      Show
      Given: A set of PSS products that will be tested at CSP LOW PSI When: The design of the PSS CI/CD pipeline is specified And: Information on the delivery method to CSP LOW PSI is requested by integrators Then: A specification for the products expected from the PSS continuous deployment and how these products will be packaged and pulled from the central artefact repository by the integrators has been agreed with System Engineering, System Team and integrator teams exists
    • 1
    • 0
    • 16.5

    Description

      Work in collaboration with System Engineering and the System Team to decide how the PSS software (testing framework, CBF emulators, etc.) will be packaged/containerised and deployed at the different PSI/AIV testing/integration environments.
      • Decide on packaging third-party dependencies (i.e. astroaccelerate, spead)

      Attachments

        Structure

          Activity

            People

              A.Noutsos Noutsos, Aristeidis
              L.Levin-Preston Levin-Preston, Lina
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 1.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Structure Helper Panel