Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-2951

Integrate an end-to-end SPS test into the PSS testing framework

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Could have
    • PI17
    • COM PSS SW
    • None
    • Data Processing
    • Hide

      Provides the automated product testing framework of PSS with an end-to-end test of the single pulse search pipeline of Cheetah with test vectors.

      Show
      Provides the automated product testing framework of PSS with an end-to-end test of the single pulse search pipeline of Cheetah with test vectors.
    • 2
    • 0
    • 19.1
    • PI22 - UNCOVERED

    Description

      Integrate an end-to-end SPS product test (including unit tests), developed in SP-2806, to the automated PSS testing framework pipeline.

      Attachments

        Issue Links

          Structure

            Activity

              People

                A.Noutsos Noutsos, Aristeidis
                L.Levin-Preston Levin-Preston, Lina
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel