Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-2870

Capture Rack Management Board (RMB) replacement design in NetTerrain

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Must have
    • PI16
    • None
    • Services
    • Hide

      Design captured in NetTerrain

      TBC - review/sign off by stakeholders

      Show
      Design captured in NetTerrain TBC - review/sign off by stakeholders
    • 1
    • 1
    • 0
    • Overdue
    • PI22 - UNCOVERED

    • Team_SKANET

    Description

      The current RMB is a custom made board containing both switching and timing components. There is a proposal to replace this custom board with COTs based switches with connectivity to the NSDN network. This feature is to capture the update design for a replacement switch in NetTerrain.

       

      Attachments

        Issue Links

          Structure

            Activity

              People

                m.deegan Deegan, Miles
                p.lewis Lewis, Peter
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 1.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:

                    Structure Helper Panel