Processor PST/COR control functionality

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
      • provide a path from CSP LMC to Alveo/P4,
      • allow more meaningful integration with CSP LMC
      • enable hardware in the loop testing for the PST beamformer
      • be able to translate the Subarray configuration commands into items the P4/Alveo understands
      • provide the conversion algorithms required for translation  
      • demonstrate that it works for the PST beamformer 
    • 2
    • 2
    • 13
    • 6.5
    • Team_PERENTIE
    • Sprint 5
    • Hide

      The feature is approximately  40-50% completed in PI#16 however the feature is not reaching to a level that's demonstrable.

      It is expected that the second half of the feature will be carried into and completed in PI#17 with a live demo.

      We are setting this feature into releasing for recognise the completion of the five stories. 

      Show
      The feature is approximately  40-50% completed in PI#16 however the feature is not reaching to a level that's demonstrable. It is expected that the second half of the feature will be carried into and completed in PI#17 with a live demo. We are setting this feature into releasing for recognise the completion of the five stories. 
    • 16.6
    • Accepted by FO
    • PI23 - UNCOVERED

    • Team_PERENTIE goal_O4

    Description

      • complete the control chain from the Subarray Config command to Alveo/P4
      • in the Allocator separate relevant configuration data into P4 and Alveo data
      • convert the parameters into appropriate Alveo register values or P4 rules
      • to expose the registers that control the functionality of the Alveo exposed to the Processor device

      Attachments

        Issue Links

          Structure

            Activity

              People

                s.vrcic Vrcic, Sonja
                y.chen Chen, Yuqing
                Votes:
                0 Vote for this issue
                Watchers:
                6 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete58.0
                  Total58.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel