AAA policy and design of supporting processes and services for AA 0.5 across SKAO

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Services
    • Hide

      In order to deploy the SKA software across the observatory so that operators, testers, users have secure and controlled access to compute infrastructure and services (front-end, infra and back office), a set of policies and procedures are required for the requirements and management of AAA along with the development of a design of integrated services observatory wide to support this.

      Show
      In order to deploy the SKA software across the observatory so that operators, testers, users have secure and controlled access to compute infrastructure and services (front-end, infra and back office), a set of policies and procedures are required for the requirements and management of AAA along with the development of a design of integrated services observatory wide to support this.
    • Hide
      • a policy for AAA/IAM specifying the SKAO requirement for AAA governance is defined
        • this should include what schemas we support, how we enroll (and de-enroll) users, and link to the acceptable use policy
      • a design of observatory wide AAA/IAM infrastructure and services is defined
        • this should be based on the deployment - the documentation can be very lightweight, and then updated if this changes as a result of the Exchange migration
        • it should include a (planned) integration with roll-out of the Acceptable Use Policy.
      Show
      a policy for AAA/IAM specifying the SKAO requirement for AAA governance is defined this should include what schemas we support, how we enroll (and de-enroll) users, and link to the acceptable use policy a design of observatory wide AAA/IAM infrastructure and services is defined this should be based on the deployment - the documentation can be very lightweight, and then updated if this changes as a result of the Exchange migration it should include a (planned) integration with roll-out of the Acceptable Use Policy.
    • 1.5
    • 0
    • PI24 - UNCOVERED

    • Team_IT Team_SPT Team_SYSTEM

    Description

      Supporting policies, procedures and services to provide AAA for SKAO for AA 0.5

      2 SP Brainstorm session.

      1 SP Review collated requirements from  SP-2622.

      4 SP to come up with a draft policy OR modification to existing ISMS policies to include these additional factors.

      3 SP define of user roles (Role-Based Access) to fit into categories of access levels.

       

      Attachments

        Issue Links

          Structure

            Activity

              People

                P.Harding Harding, Piers
                P.Harding Harding, Piers
                Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 1.5

                  IssuesStory Points
                  To Do410.0
                  In Progress   00.0
                  Complete00.0
                  Total410.0