ITF Test Equipment testing flow integration

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Services
    • Hide

      To have fully repeatable, traceable tests of automated test procedures we need to integrate the text executions into the SKAO test execution workflow. This requires Xray Test plans and BDD tests to be set up in the standard way and the execution linked up into gitlab.

      Show
      To have fully repeatable, traceable tests of automated test procedures we need to integrate the text executions into the SKAO test execution workflow. This requires Xray Test plans and BDD tests to be set up in the standard way and the execution linked up into gitlab.
      • Test Plan defined
      • proposed BDD tests implemented
      • test execution visible
      • process documented for repeatability
    • Inter Program, Intra Program
    • 1
    • 1
    • 0
    • Team_VULCAN
    • Sprint 5
    • Hide
      • The Test Plan has been defined under XTP-9052 and the BDD tests can be found in the plan including the output of the test executions.
      • The Test Executions haven been run and tagged both against ITF LOW HW and simulation/STFC execution.
      • ITF HW test executions can be triggered from the test plan, see
      • the process is documented under https://confluence.skatelescope.org/display/SE/%5BLOW-255%5D+Procedure+to+create+XRAY+Tests+for+ITF-TE+feature and should be considered to make more publicly available if there is interest.
      • Note that the requirements status is "incomplete" as we have mixed two environment in this plan and not all test can be run in both.
      Show
      The Test Plan has been defined under XTP-9052 and the BDD tests can be found in the plan including the output of the test executions. The Test Executions haven been run and tagged both against ITF LOW HW and simulation/STFC execution. ITF HW test executions can be triggered from the test plan, see the process is documented under https://confluence.skatelescope.org/display/SE/%5BLOW-255%5D+Procedure+to+create+XRAY+Tests+for+ITF-TE+feature and should be considered to make more publicly available if there is interest. Note that the requirements status is "incomplete" as we have mixed two environment in this plan and not all test can be run in both.
    • 15.6
    • Stories Completed, Integrated, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI24 - NOTRUN

    Description

      Define BDD tests and Test plans, and implement the tests against the TANGO devices exposed through SP-2576

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.allan Allan, Verity
                Vani.Naram Naram, Vani
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 1.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete67.0
                  Total67.0