Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-2559

Understand the implications of upgrading the P4 switches to 400G

Details

    • Services
    • Hide

      Without this work we won't have a signal chain from the SPS racks to the CBF.

      Show
      Without this work we won't have a signal chain from the SPS racks to the CBF.
    • Hide

      Design and ICDs understood and agreed between all parties.

      Show
      Design and ICDs understood and agreed between all parties.
    • 2
    • 2
    • 0
    • Overdue
    • PI22 - UNCOVERED

    • Team_PLANET Team_SKANET

    Description

      Since the current P4 switches are going End of Sale (EoS) we need to understand the interface options available for the proposed new 400G switch within the CBF.

      https://www.aps-networks.com/wp-content/uploads/2022/04/220421_APSN_APS7232Q_V01.pdf

      The current design uses 100G client at the MRO and the Pawsey.
      With this new switch we have a number of options available to breakout the 400G ports on the P4 switches to 100G clients on the Transmission.

      This feature is to understand our options and design based on the optimum solution.

      Attachments

        Structure

          Activity

            People

              m.deegan Deegan, Miles
              p.lewis Lewis, Peter
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 2.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0

                Dates

                  Created:
                  Updated:

                  Structure Helper Panel