Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-2492

Understanding of the CI/CD environment for the LOW CSP

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Must have
    • PI15
    • None
    • Obs Mgt & Controls
    • Hide

      This prepares TOPIC to start setting up verification and being ready for integrating and testing CSP

      Show
      This prepares TOPIC to start setting up verification and being ready for integrating and testing CSP
    • 2
    • 2
    • 8
    • 4
    • Team_TOPIC
    • Sprint 5
    • Hide

      https://jira.skatelescope.org/browse/SPO-1863

      • [Done] KR2: CLP Gitlab runner connected to CI/CD environment (sprint 15.4->sprint 16.1)
      Show
      https://jira.skatelescope.org/browse/SPO-1863 [Done] KR2: CLP Gitlab runner connected to CI/CD environment (sprint 15.4->sprint 16.1)
    • 16.2
    • Stories Completed, Integrated, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI24 - UNCOVERED

    • Team_TOPIC

    Description

      Understanding of the CI/CD environment for the LOW CSP

      As the TOPIC team will be taking up the integration and verification of CSP for LOW, an understanding of how the repos are organised for different products, the CI/CD environment and tools to run test is needed. This includes learning about both the firmware and software aspects. Learning from the experiences of the AIV teams, including MID as well especially for Xray integration would be expected.

      An overview of the CI/CD environment envisaged for use at the CLP is presented in https://docs.google.com/presentation/d/1jOpk2iPcUfE0bb3WAYBc9Q5_CxKH3Yyr/edit#slide=id.p6

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                v.mohile Mohile, Vivek
                Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete510.0
                  Total510.0

                  Dates

                    Created:
                    Updated:
                    Resolved: